This data set is the runoff and sediment observation data of the runoff station in peijiamaogou watershed from 1986 to 1990. Through the water level observation and sediment sampling of the runoff station, the runoff and sediment amount during the runoff generation are calculated. Daily average discharge, daily average discharge of peijiagou station, daily average flow rate of flood and measured data table of flood volume at peijiagou station are included. The runoff stations are shown in the description of the situation of peijiamaogou watershed from 1986 to 1990.
collect time | 1986/01/01 - 1990/12/31 |
---|---|
collect place | Peijiamaogou watershed, Suide County, Yulin City, Shaanxi Province |
altitude | 2.0m - Nonem |
data size | 310.3 kB |
data format | |
Coordinate system | WGS84 |
Artificially timed observations
1. Water level observation: peijiamao runoff station uses the basic water gauge to measure the water level. In non flood season, the observation shall be conducted once at 8:00 a.m. in case of rainfall, the observation shall be conducted twice at 8:00 and 20:00 when the daily water level changes slowly; when the daily water level changes greatly or there is a slow peak and valley, it shall be observed four times at 2:00, 8:00, 14:00 and 20:00. When the water level changes violently in flood season, the observation shall be made in multiples of 6 minutes. 2. Flow measurement method: small buoy method is used to measure the flow when the flow is small in the normal period, and the midstream buoy method is used when the flow is large and rises sharply and falls sharply in flood period. Generally, the current is measured for no less than 5 times in each large flood process, and 2-3 middle buoys with the shortest duration, normal operation and closest velocity are selected as effective buoys, and the difference of operation duration shall not exceed 10-15% 。 3. Sediment sampling and treatment: the midstream buoy method is used to sample the sediment at the flow measurement section. The frequency of sediment sampling depends on the frequency of flood water level change, and the sampling frequency is increased to control the change of sediment concentration at flood peak. The sample was treated by displacement method.
Manual observation is carried out by professional and technical personnel; four levels of manual verification are carried out in the process of data input, which are tabulation, initial calibration, re calibration and audit, so as to ensure the data quality.
# | Dataset title |
# | title | file size |
1 | 1.实测流量成果表.zip | 66.3 kB |
2 | 1986-1990裴家峁沟流域径流泥沙说明.docx | 21.1 kB |
3 | 2.洪水水文要素摘录表.zip | 73.6 kB |
4 | 3.逐次洪水测验成果表.zip | 39.1 kB |
5 | 4.逐日平均流量表.zip | 10.9 kB |
6 | 5.逐日平均含沙量表.zip | 50.0 kB |
7 | 6.逐日平均悬移质输沙率表.zip | 49.3 kB |
Runoff modulus runoff coefficient sediment transport rate water level erosion modulus discharge sediment concentration runoff depth runoff soil loss
©Copyright 2005-2020. Northwest Institute of Eco-Environment and Resources, CAS.
Donggang West Road 320, Lanzhou, Gansu, China (730000)